McKenzie River Trail

March 31, 1974

A beautiful trip along the upper McKenzie on an excellent trail with a few flowers, a few birds, a little snow on the trail and some rain. The trip started at Buck Bridge on the Clear Lake Highway and followed the west side of the river to Deer Creek for lunch, then a short way along Deer Creek before crossing and rejoining the McKenzie to Trail Bridge Dam. Across the dam to the cars which had been shuttled up before the trip started. Trail Bridge Dam is currently the end of the trail. Continuation is dependent on pressures from the public and funds. Adding to the pressure were Catherine L. Brosseau, Larry & Zotty & Jeff Cash, Steve Elickson, Barbara Froering, Rich Freeman, Stan Sweton, Dorothy Turner, Janet Woods and the leaders Ken & Robin Lodewick.


Home   About Us    Our Activities    Contact Us   Join Us    Gallery   Outdoor Links    Members Only

Copyright 2000-2016  Obsidians, Inc.      Last Updated  31 Dec 2009

Email: Obsidians          Email: Webmaster